Let me start by saying thank you to anyone that can assist.
So this will be a two phase request.
Phase one: Aiming for 10/23.
Shift the aquarium to rollers in the driveway.
This is so I can access the cabinet pieces and put it together.
Phase 2: Aiming for 10/23 or 10/24
If 10/23, phase 2 will have to occur at minimum 5 hours after phase 1.
Move the tank onto the stand and push into corner.
The tank weighs 550lbs. I assume we can do it with 4-5 people.
Times are flexible, but if trying to knock it all out on 10/23 then it would be ideal if we could do early in the morning on 10/23.
Please let me know below if you’d be able to assist and with what phase.
Phase 1: 10/23 @ 10 am
Phase 2: 10/24 @ 4pm
San Jose, near the airport.
I will get bagels and coffee for morning crew, and pizza and beverages for phase 2 crew.
So this will be a two phase request.
Phase one: Aiming for 10/23.
Shift the aquarium to rollers in the driveway.
This is so I can access the cabinet pieces and put it together.
Phase 2: Aiming for 10/23 or 10/24
If 10/23, phase 2 will have to occur at minimum 5 hours after phase 1.
Move the tank onto the stand and push into corner.
The tank weighs 550lbs. I assume we can do it with 4-5 people.
Times are flexible, but if trying to knock it all out on 10/23 then it would be ideal if we could do early in the morning on 10/23.
Please let me know below if you’d be able to assist and with what phase.
Phase 1: 10/23 @ 10 am
Phase 2: 10/24 @ 4pm
San Jose, near the airport.
I will get bagels and coffee for morning crew, and pizza and beverages for phase 2 crew.