Hey everyone.
I recently picked up a jebao dp-4 dosing pump. I'm basically writing this post to ask for advice on calibrating the pumps themselves. I know people generally use that airline tubing, but I'm going to try to use RO lines instead.
Should all of my in lines and out lines be the length I planned for them to be for when I put my dosing pump in its' permanent place? Or does calibrating only help determine how long the pump needs to operate to get fluids through?
Thanks!
I recently picked up a jebao dp-4 dosing pump. I'm basically writing this post to ask for advice on calibrating the pumps themselves. I know people generally use that airline tubing, but I'm going to try to use RO lines instead.
Should all of my in lines and out lines be the length I planned for them to be for when I put my dosing pump in its' permanent place? Or does calibrating only help determine how long the pump needs to operate to get fluids through?
Thanks!